Licensed Selective Demolition Contractor | Serving Central Florida

Remove What’s Needed.
Protect What Stays.

Controlled partial demolition for renovations, additions, structural changes, and interior reconfiguration, completed with the surrounding property in mind.

★★★★★4.8 / 5 Google rating
CBC1264327Florida license

Targeted Removal

Adjacent Areas Protected

Debris Hauled Away

Clean Renovation Handoff

Controlled partial removal

Precision
before power.

Selective demolition removes only the parts of a structure that need to change. The work requires clear boundaries, careful sequencing, utility coordination, dust control, and protection for the areas that remain.

Citrus Demolition develops the removal plan around the renovation scope for homeowners, builders, investors, property managers, and commercial contractors.

Selective demolition capabilities

Built around
what must remain.

The scope is based on the renovation plan, structural conditions, utilities, occupied areas, access, material type, protection requirements, and the condition expected at handoff.

01

Interior gut-outs

Targeted removal of finishes, cabinetry, fixtures, ceilings, flooring, and non-structural interior materials.

02

Walls and partitions

Interior walls and selected masonry sections removed according to approved structural and renovation plans.

03

Additions and porches

Attached garages, rooms, porches, lanais, and exterior sections separated from the structure that remains.

04

Roof and structural sections

Selected roof areas, framing, beams, or damaged components removed with the required engineering and support plan.

05

Flooring and concrete

Tile, flooring systems, topping slabs, equipment pads, and selected concrete areas removed for reconfiguration.

06

Debris and cleanup

Included material is separated, loaded, hauled away, and cleared from the approved work zone.

Targeted removal. Preserved structure.

Open space. Ready for the rebuild.

Selective demolition should leave the next trade with a clear, usable work area. Removed materials are hauled away while the approved structure, storefront, and building systems remain protected for renovation.

Our selective demolition process

Five clear steps.
Controlled from start to handoff.

01

Walk the scope

We review the plans, existing conditions, access, materials, utilities, and required handoff.

02

Mark remove and remain

The work zone and preservation boundaries are confirmed before demolition begins.

03

Coordinate safety

Required permits, utility shutdowns, engineering, protection, and hazard testing are addressed.

04

Remove in sequence

Materials are dismantled in a controlled order suited to the structure and renovation plan.

05

Haul and hand off

Included debris is removed and the approved work zone is cleared for the next trade.

Pricing the actual scope

What affects
the estimate.

Structural complexity

Load-bearing components, roof connections, shared walls, engineering requirements, and temporary support affect the work sequence.

Protection requirements

Occupied areas, storefronts, landscaping, finishes, dust control, vibration limits, and weather protection shape the setup.

Access and sequencing

Interior access, floor level, equipment limits, work hours, other trades, and project phasing affect labor and scheduling.

Material and disposal

Concrete, masonry, roofing, framing, finishes, fixtures, and regulated materials require different removal and disposal plans.

Customer reviews

Trusted on the
work that matters.

Real feedback from Central Florida property owners who trusted Citrus Demolition with their project.

★★★★★

“They showed up and did the work. Final inspection passed. Great job. Highly recommend!”
Donna MastGoogle review

★★★★★

“The removal was excellent and the job site was like they were never there.”
Teb JonesGoogle review

★★★★★

“Very easy to deal with and an amazing team. This is the second time I’ve used them.”
Steven TroegerGoogle review

Selective demolition FAQs

What to know before targeted removal.

How is selective demolition different from a full teardown?

A full teardown removes the entire structure. Selective demolition removes only defined materials or sections while preserving the approved building components needed for renovation or reuse.

Does selective demolition require a permit?

Permit requirements depend on the scope, structural work, utilities, occupancy, and local jurisdiction. Engineering or approved plans may also be required when structural components are affected.

Can selective demolition happen in an occupied building?

Some projects can be phased around occupied areas when the building, work zone, access, dust control, noise limits, and safety plan allow it. The conditions must be reviewed before scheduling.

How are utilities handled?

Affected electrical, plumbing, gas, HVAC, and other services must be identified and safely shut down, capped, relocated, or protected by the appropriate licensed trade before removal reaches them.

Is debris removal included?

Yes. Included demolition material is loaded, hauled away, and cleared from the approved work zone so the next phase can begin.

Selective demolition service area

Local crews across Central Florida.

Selective demolition is available across Citrus, Hernando, Levy, Marion, Lake, and Pasco counties. Contact the team to discuss the renovation plan, access, preservation requirements, and scheduling.

Check availability for your property
Citrus CountyHernando CountyLevy CountyMarion CountyLake CountyPasco County

Your property. Your next move.

Let’s clear
the way.

Tell us what needs to come down, move out, or get ready. We’ll take it from there.

Free estimate

Tell us about the job.

Give us the essentials. You can share the remaining details when we respond.

No pressure and no obligation. We’ll follow up to discuss your project.

Submitting opens a prefilled text message to our team. Standard messaging rates may apply.